Project Start Date: November 2021
Design/Build: No
Owner: CBRE Ltd.
Site: CB Richard Ellis Ltd. Block 51 – 800 Hornby Street, Vancouver, BC
SqFt: 7500 sq ft
Project: Replacement of the large existing domestic hot water (DHW) hydronic/steam heating tanks with full electric capacity DHW tanks. Eliminate existing hydronic and steam systems for existing DHW tanks. Provide electrical power for new electric DHW tanks. Provide connections for future pre-heated domestic cold water systems generated from heat recovery chiller. Hazardous materials removal.