Centennial Secondary NLC Fit-Out

The school district’s objective was to create a welcoming, functional space with visually appealing interiors, and open areas that foster both creativity and connection. The project was carried out with this vision in mind, ensuring every element, from lighting to finishes contributed to a space that could serve both students and the wider community.

Work began with selective demolition to clear outdated elements and make way for the new layout. Key construction elements included extensive millwork installations for functional and visually appealing interiors, and resilient flooring made  for high-traffic educational use.

Mechanical and electrical systems were modernized to increase operational efficiency and comfort, while integrated fire protection upgrades ensured enhanced safety for students Glazing enhancements introduced increased natural daylight into the space, creating a more open and inviting environment.

Additional masonry work contributed to the facility’s structural strength and added visual depth, aligning  the interior with the architectural character of the larger school campus.

NEXT PROJECT

Charles Best Secondary Classroom Addition

Centennial Secondary NLC Fit-Out